LNB Construction Inc. successfully completed a project for Westpro Infrastructure in Fort McMurray, Alberta in summer 2013. I found their management team to be committed to the completion of a top quality project. LNB Construction personnel were knowledgeable, hard working and professional in all aspects of their work. LNB Construction simply performed a miracle - mobilized in one week notice and was able to complete earth and civil works on time in spite of the record breaking wettest summer in 30 years.

WESTPRO Infrastructure

In my opinion, LNB Construction is the most experienced company when it comes to working with blasting jobs and engineered projects, LNB has the support staff for site design, Topcon equipment, survey specialist etc.
LNB has been involved on all WBU Produced Ponds for the last two years which includes, but not limited to liner installs, man-hole system installs, complicated pond floor sub drain systems, and has professional crew for fusing of leak detection pipe and pond floor drainage systems. LNB has all the precision equipment and personnel for these complicated installs.
PROGRESS ENERGY

The Lower Nicola Indian Band has been involved in numerous joint venture projects with LNB Construction Inc. since 2012. During this time, we have found LNB Construction to be committed to growing the partnership and expanding the opportunities available to both the Band and members of the community. Most recently, we have been working with LNB Construction on all phases of the Merritt Area Transmission (MAT) Project for BC Hydro. Throughout this project we have found the team at LNB to be committed to working in partnership with us in order to provide BC Hydro with a high quality, well managed project.
Todd Chamberlain, Natural Resources Manager, LOWER NICOLA INDIAN BAND

LNB Construction has recently completed two grading projects with the M.D. of Greenview near Grande Cache and Ridgevalley Alberta over the past 3 years. They have done a commendable job on both projects with full owner satisfaction and I have found their superintendent's and operators' to be cooperative and conscientious. LNB Construction personnel have been knowledgeable and professional in all aspects of their work. Each grading project presented various challenges and in each case, those problems were resolved in an efficient and timely manner.
GENIVAR

LNB successfully completed the water management infrastructure project for Anglo American’s Peace River Coal operation in the summer of 2014. The project was particularly challenging given the terrain, the extremely tight construction window and the high degree of environmental controls needed to mitigate the construction impacts on the adjacent environmentally sensitive Babcock Creek near Tumbler Ridge. As Project Director, I was very impressed by the professionalism of the LNB’s site team, their willingness to work together with the client project team and their expertise in the operation of GPS controlled equipment. As a result the project exceeded expectation by achieving the safety, environment, quality, time and budget milestones.
Keith Prakke, Project Director (Peace River Coal - Water Management)