Peace River Coal – Arch Culvert Project

LNB Construction Inc. was responsible for the provision of a haul road for mining equipment on site at the Peace River Coal mine in Tumbler Ridge, BC. This project included the construction of a multi-plate that was roughly 12mx12mx44m, along with road construction and water management on both sides of the structure. LNB worked closely with Landmark Solutions to construct the multi-plate structure, placing approximately 30,000m3 of fill in layers.

  • 60,000m3 of imported/exported materials
  • Sensitive environmental area with work over water course
  • Clearing, grubbing
  • Settling Ponds, Collection Ditches, Road construction