Progress Energy Civil Works

What the Client Said

“In my opinion, LNB Construction is the most experienced company when it comes to working with blasting jobs and engineered projects, LNB has the support staff for site design, Topcon equipment, survey specialist etc. LNB has been involved on all WBU Produced Ponds for the last two years which includes, but not limited to liner installs, man-hole system installs, complicated pond floor sub drain systems, and has professional crew for fusing of leak detection pipe and pond floor drainage systems. LNB has all the precision equipment and personnel for these complicated installs.”

Joel Lizee, Western Business Unit – Construction Team Lead, PROGRESS ENERGY

LNB has worked with Progress Energy on various projects in the North Montney Gas Reserve. Progress Energy has utilized our design team with 3D capabilities on compressor sites and frac ponds to quantify material for cost savings. Through this process design flaws can be recognized and quickly corrected saving time and unnecessary job costs to the project. Once the design has been checked it can then be put into the GPS units in the equipment for machine control, which assists the operators to build the site or ponds within cm of design.
Our scope included:

  • Road construction
  • Compressor site construction
  • Frac pond construction
  • Installation of Geomembrane prior to liner installation
  • Lease site construction
  • Bridge layout